Early trial planting
19 May · trial dateThe earliest tested date produced the strongest commercial yield and root-size results in the Moncada experiment.
Academic field-trial guide · Moncada · Valencia
An IVIA experiment at Moncada compared sweet potato planting on 19 May, 17 June and 11 July. In that 2005 trial, marketable yield and root size were strongest in the May planting and declined with delay.
Valencian Community · IVIA trial location
Growing for a home garden? See the general sweet potato guide.

Regional crop context
The Ministry-hosted field study compared cultivars, planting dates, commercial yield and root size at a named Valencia research site.
These are cultivar-specific experimental dates from 2005, published in 2006. They describe the Moncada trial, not every Spanish climate or current grower practice.
Step 1 of 7 · Assess
Use the trial to compare cultivar and planting-date trade-offs. Confirm market specifications, slips, irrigation and harvest capacity before selecting the field date.
6 topics still to verify· planning aid only, not a suitability score
Selections stay in this browser tab and are not saved or sent anywhere.
Need a field-specific review? Run a coordinate-level farm audit for localized conditions.
Root-knot nematodes, wireworms and other soilborne pests affect marketable roots. Soil sampling, clean planting material, crop rotation and equipment sanitation are the first decisions; chemical treatment depends on current field results and product labels.
Step 2 of 7 · Plan
The trial dates were 19 May, 17 June and 11 July. The month strip shows the Moncada reference point’s 1996–2025 climate means.
The earliest tested date produced the strongest commercial yield and root-size results in the Moncada experiment.
The June treatment had lower commercial yield and root size than May; results varied by cultivar.
The July treatment was slightly below June overall, although one early cultivar performed better under the late date.
Historical regional climate
Green tiles are months whose mean soil temperature is in the 77–86°F root-development range; all other tiles are neutral and show the value. Early, main and late badges mark the 10th, median and 90th-percentile dates for reaching 18.3°C for 4 consecutive days. Bar height shows the mean.
Early soil-warming date
April 06
10th percentile
Median soil-warming date
April 25
median year
Late soil-warming date
May 09
90th percentile
Months whose historical mean soil temperature reaches the 65°F reference: May, June, July, August, September, October. Months in the 77–86°F root-development range: June, July, August. These are monthly regional averages, not planting dates or a frost check.
Open-Meteo · era5_land · 1996-01-01 to 2025-12-31 · Reference point 39.55°N, 0.40°W. Soil-temperature values are modeled at 0–7 cm model layer; the 65°F (18.3°C) transplant reference comes from a 4-inch field measurement. Use the regional calendar above with a current field reading.
Sweet potato slips establish best after frost risk has passed and the soil is at least 65°F (18.3°C) at 4 inches. That is a field measurement; the climate strip above shows regional history.
Use the regional crop duration and expected fall cutoff to choose a variety and harvest date. Confirm market grade, digging capacity and curing space before planting.
Step 3 of 7 · Prepare
The study gives a 1.1 × 0.4 m trial layout. Prepare a loose, drained root zone and align the bed with the farm’s irrigation, planting and digging equipment.
Keep bed height and shape consistent with soil texture, water movement and the equipment used on the farm.

Base pH and fertilizer rates on representative soil tests. Avoid excess nitrogen, which can favor vine growth over marketable storage-root sizing.
Step 4 of 7 · Establish
Sweet potatoes are established from vegetative vine cuttings called slips. Buy clean, healthy slips in the target variety and quantity, and keep them shaded and moist until planting.

The Moncada study used 110 cm between rows and 40 cm between plants. The calculator defaults to that tested pattern and bounds planning changes.
Planting calculator
Estimated slips
22,727
at 110 × 40 cm
Estimate = field area ÷ row-by-slip spacing. Keep values within the published bounds, then match the starting pattern to equipment and target root grade. Headlands and replant allowance are not included.
Step 5 of 7 · Manage
The first weeks determine how evenly slips establish and how the crop competes. Protect the crop from early weed competition and scout for wireworms, flea beetles and root-knot nematodes. Use field history, clean planting material and equipment sanitation to reduce avoidable risk.
Water immediately after setting and maintain enough moisture for root establishment. Track rainfall and soil moisture; avoid keeping beds saturated.
Scout early and maintain a weed-free start through canopy closure. Choose current control methods for the farm’s production system.
Wireworms, flea beetles and root-knot nematodes can downgrade roots. Keep field history and scouting records tied to each harvest lot.
Use certified or otherwise clean slips, avoid carrying soil on slips, and clean equipment after infested fields to limit movement of nematodes and soilborne disease.
Step 6 of 7 · Harvest
The trial measured commercial yield and root size across the tested dates and varieties. Use cultivar maturity and target grade to set harvest.

Harvest period
Plan by variety, market size, planting date, field condition and frost risk.
Cure
A crop-level curing reference is 7–10 days with airflow; use the facility and buyer protocol for the harvested lot.
Store
Maintain stable temperature, humidity and ventilation after curing.
Step 7 of 7 · Reference
Moncada planting dates of 19 May, 17 June and 11 July; commercial yield and root-size outcomes by cultivar; 1.1 × 0.4 m trial spacing.
European field trial comparing 80 × 20, 80 × 30, 100 × 20 and 100 × 30 cm row-by-plant spacing. Used as a crop-level spacing reference, not a local calendar.
Crop-level soil-temperature context, bed preparation, equipment-led row spacing and the relationship between plant density and root size.
Crop-level transplant establishment, slips, frost sensitivity and raised-bed practice. Missouri calendar dates are not applied to other regions.
Shared crop-level reference for curing and storage conditions. Its Texas planting calendar is used only on the Texas page.
Photo authorship and licence information are recorded centrally. View photo credits.