Early transplant
April · IGP specificationThe opening month of the official field-transplant period following February nursery propagation.
Protected production-area guide · Aljezur · southwest Portugal
The official Batata Doce de Aljezur specification covers Aljezur and named Odemira parishes. It sets February nursery propagation, April–May field transplanting and an October main harvest.
Aljezur and named Odemira parishes · IGP area
Growing for a home garden? See the general sweet potato guide.

Regional crop context
DGADR’s protected-geographical-indication specification defines the southwest production area and describes its registered crop calendar and 65 × 20 cm planting pattern.
This page represents the official Aljezur/Odemira production area, not every climate region in Portugal.
Step 1 of 7 · Assess
Start nursery propagation in February, have slips ready for the April–May field period, and reserve harvest capacity for the main October crop.
6 topics still to verify· planning aid only, not a suitability score
Selections stay in this browser tab and are not saved or sent anywhere.
Need a field-specific review? Run a coordinate-level farm audit for localized conditions.
Root-knot nematodes, wireworms and other soilborne pests affect marketable roots. Soil sampling, clean planting material, crop rotation and equipment sanitation are the first decisions; chemical treatment depends on current field results and product labels.
Step 2 of 7 · Plan
DGADR separates February nursery propagation from April–May field transplanting. The climate strip shows 1996–2025 means at the Aljezur reference point.
The opening month of the official field-transplant period following February nursery propagation.
DGADR identifies this as the recognized field period for the Aljezur crop.
Historical regional climate
Green tiles are months whose mean soil temperature is in the 77–86°F root-development range; all other tiles are neutral and show the value. Early, main and late badges mark the 10th, median and 90th-percentile dates for reaching 18.3°C for 4 consecutive days. Bar height shows the mean.
Early soil-warming date
March 25
10th percentile
Median soil-warming date
April 13
median year
Late soil-warming date
April 27
90th percentile
Months whose historical mean soil temperature reaches the 65°F reference: May, June, July, August, September, October. Months in the 77–86°F root-development range: June, July, August, September. These are monthly regional averages, not planting dates or a frost check.
Open-Meteo · era5_land · 1996-01-01 to 2025-12-31 · Reference point 37.32°N, 8.80°W. Soil-temperature values are modeled at 0–7 cm model layer; the 65°F (18.3°C) transplant reference comes from a 4-inch field measurement. Use the regional calendar above with a current field reading.
Sweet potato slips establish best after frost risk has passed and the soil is at least 65°F (18.3°C) at 4 inches. That is a field measurement; the climate strip above shows regional history.
Use the regional crop duration and expected fall cutoff to choose a variety and harvest date. Confirm market grade, digging capacity and curing space before planting.
Step 3 of 7 · Prepare
The IGP specification defines a southwest production system. Prepare loose, drained beds and keep spacing consistent with the registered pattern and the farm’s equipment.
Keep bed height and shape consistent with soil texture, water movement and the equipment used on the farm.

Base pH and fertilizer rates on representative soil tests. Avoid excess nitrogen, which can favor vine growth over marketable storage-root sizing.
Step 4 of 7 · Establish
Sweet potatoes are established from vegetative vine cuttings called slips. Buy clean, healthy slips in the target variety and quantity, and keep them shaded and moist until planting.

The official specification sets 65 cm between rows and 20 cm between plants. Calculator bounds allow equipment planning around that registered starting pattern.
Planting calculator
Estimated slips
76,923
at 65 × 20 cm
Estimate = field area ÷ row-by-slip spacing. Keep values within the published bounds, then match the starting pattern to equipment and target root grade. Headlands and replant allowance are not included.
Step 5 of 7 · Manage
The first weeks determine how evenly slips establish and how the crop competes. Protect the crop from early weed competition and scout for wireworms, flea beetles and root-knot nematodes. Use field history, clean planting material and equipment sanitation to reduce avoidable risk.
Water immediately after setting and maintain enough moisture for root establishment. Track rainfall and soil moisture; avoid keeping beds saturated.
Scout early and maintain a weed-free start through canopy closure. Choose current control methods for the farm’s production system.
Wireworms, flea beetles and root-knot nematodes can downgrade roots. Keep field history and scouting records tied to each harvest lot.
Use certified or otherwise clean slips, avoid carrying soil on slips, and clean equipment after infested fields to limit movement of nematodes and soilborne disease.
Step 6 of 7 · Harvest
DGADR describes an approximately four-month crop and identifies October as the main harvest period.

Harvest period
Plan by variety, market size, planting date, field condition and frost risk.
Cure
A crop-level curing reference is 7–10 days with airflow; use the facility and buyer protocol for the harvested lot.
Store
Maintain stable temperature, humidity and ventilation after curing.
Step 7 of 7 · Reference
Protected production area, February nursery phase, April–May field transplant, 65 × 20 cm spacing, crop duration and October harvest.
European field trial comparing 80 × 20, 80 × 30, 100 × 20 and 100 × 30 cm row-by-plant spacing. Used as a crop-level spacing reference, not a local calendar.
Crop-level soil-temperature context, bed preparation, equipment-led row spacing and the relationship between plant density and root size.
Crop-level transplant establishment, slips, frost sensitivity and raised-bed practice. Missouri calendar dates are not applied to other regions.
Shared crop-level reference for curing and storage conditions. Its Texas planting calendar is used only on the Texas page.
Photo authorship and licence information are recorded centrally. View photo credits.